NTPC generates power for Yellowknife at the Snare and Bluefish hydro sites and through some diesel generation at the Jackfish plant. Power is sold at wholesale rates to Northland Utilities Ltd. which distributes it to the community.

The plant has three diesel generators with a combined capacity of 1.16 MW. A small heat recovery system heats three buildings in the community.  One generator was replaced in 2012.

NTPC generates power for Hay River at the Taltson hydro site. Back up power is provided by diesel generation.

This power plant consists of four diesel generators with a total capacity of 3.2 MW. A 104 kW solar array installed in 2012 provides up to 15 percent of Fort Simpson’s power needs.

NTPC generates and distributes power for Dettah at the Snare and Bluefish hydro sites and through some diesel generation at the Jackfish plant in Yellowknife.

Residents receive electricity generated by the Snare Hydro system. A 2.0 MW diesel generator was installed in 2012 to provide standby power.