Northwest Territories Power Corporation (“NTPC”) is requesting quotations to select a vendor to provide a utility small bucket truck.
These specifications are not intended as complete design specifications to be used for design and
Northwest Territories Power Corporation (“NTPC”) is requesting quotations to select a vendor to provide a utility digger truck.
These specifications are not intended as complete design specifications to be used for design and
Northwest Territories Power Corporation (“NTPC”) is requesting quotations to select a vendor to provide a utility bucket truck.
Vegetation Brushing - Inuvik - Duck Lake Park line, Navy Road line and Carn Road line See Appendix C for Map of NTCP Power Lines in Inuvik.
The vegetation has reclaimed these lines making accessing the poles for maintenance difficult. The brush along these lines consists of 90% willows with a height of approximately 3-5 meters. Attached site assessment photos provide location, vegetation types and density.
The Northwest Territories Power Corporation (“NTPC”) is requesting Proposals from qualified “Proponents” to provide vegetation control services to eliminate vegetation in the electrical substations located in the North and South Slave regions. The primary method of control is the use of residual herbicides to keep the sites free of vegetation for one or more seasons. Where sites are near water, only non-residual herbicides and mechanical controls are to be used, pending approval from GNWT Environment and Natural Resources (ENR).
To build and transport transformer to Snare Hydro. Relocation of the Snare Falls Substation, this portion is to supply a 5/6.6/8.3MVA transformer as per the specifications outlined in the RFP.
Deadline for Questions & Inquiries May 4, 2022
Final Addendum Issued May 10, 2022
RFP Closing May 19, 2022
Start of Work TBD (Subject to schedule change)
The Northwest Territories Power Corporation (“NTPC”) is requesting Proposals from
qualified “Proponents” to provide vegetation/brush clearing along the upstream and
downstream slopes and toe of the hydro dams at the Snare Hydro system.
Work Schedule Window:
Schedule Window 1 June 7 – July 11, 2022
Schedule Window 2 July 26 – September 12, 2022
The Northwest Territories Power Corporation (“NTPC”) is requesting Proposals from
qualified “Proponents” the RFP entitled “Mechanical and Electrical Works for Taltson
Hydro Support Infrastructure - Taltson Hydroelectric Facility.” The scope of works
included in the RFP are to upgrade the existing fuel system, install generator tie ins, an
MV outdoor contactor. The existing fuel system upgrade will include the install one (1),
90,000 L diesel storage tank to be provided by NTPC, and the installation of all piping